YCD Studio
Our Work

Residential Architecture

Custom homes, ADUs,
and renovations.

YCD Studio designs homes that respond to the way you actually live — balancing light, privacy, and connection to site. From accessory dwelling units to ground-up custom residences, we guide every project from first sketch through final inspection across the San Francisco Bay Area.

Sonoma Residence by YCD Studio — modern residential architecture in the Bay Area

What We Design

Three practice areas under one roof.

Each one has its own regulatory path, budget logic, and design opportunity. We bring the same level of care to a 400 sf JADU as we do to a ground-up custom home.

Custom New Construction

Ground-up homes designed around your site, your program, and California's evolving energy code. We handle massing studies, zoning analysis, Title 24 energy modeling, Cal Green compliance, and full structural and MEP coordination — so the permit set is complete on first submittal.

  • Single-family and multi-family residences
  • Site analysis, zoning research, and feasibility
  • Title 24 energy modeling and Cal Green
  • Structural, MEP, and civil engineering coordination
  • Interior material and finish specifications

ADUs & JADUs

California's ADU laws (AB 2221, SB 897) have made accessory dwelling units one of the fastest paths to added living space or rental income. We design detached, attached, and garage-conversion ADUs that maximize livability within state and local code limits — and most jurisdictions waive impact fees on ADUs under 750 sf.

  • Detached ADUs up to 1,200 sf (state preemption)
  • Garage conversions and JADUs up to 500 sf
  • Setback and height analysis under current state law
  • Pre-approved ADU plan programs (select jurisdictions)
  • Utility separation and sub-metering strategies

Remodels & Additions

Kitchen and bath renovations, second-story additions, and whole-home remodels that preserve what works and rethink what doesn't. We navigate non-conforming setbacks, historic overlays, and scope creep with equal precision — and we coordinate with your contractor from day one.

  • Kitchen, bathroom, and whole-home remodels
  • Second-story and rear additions
  • Open-plan conversions and structural modifications
  • Accessibility upgrades (ADA-adjacent and aging-in-place)
  • Historic district and design-review submittals

Process

Five phases. No surprises.

A clear workflow that keeps timelines honest and pulls every consultant in at the right moment.

01

Discovery & Site Analysis

1–2 weeks

We visit the site, review your zoning (setbacks, FAR, lot coverage, height limits), confirm utility points, and photograph existing conditions. You walk us through how you live, what you need, and what the budget looks like. We leave with a clear project brief and a realistic scope-of-work outline.

02

Schematic Design

3–4 weeks

Floor plans, sections, and 3D massing studies that test layout options against your program and zoning envelope. We present two to three directions, refine the preferred scheme, and lock in the design intent before moving into documentation.

03

Construction Documents

4–8 weeks

Full architectural drawing sets, structural engineering, Title 24 energy calculations, and Cal Green checklists. We coordinate with structural, mechanical, electrical, and plumbing engineers so the permit set is complete on first submittal.

04

Permitting

4–12 weeks (city dependent)

We submit to the local building department, respond to plan-check corrections, and track the application through approval. San Francisco averages 8–12 weeks for a standard residential permit, while some East Bay cities clear ADUs in under 4 weeks.

05

Construction Administration

Through completion

Site visits, RFI responses, submittal reviews, and change-order evaluation. We stay involved from groundbreaking through final inspection so what gets built matches what was designed.

Investment

Bay Area residential cost ranges.

2025 Bay Area construction costs. These ranges cover hard construction; design fees, engineering, and permits are typically 12–18% on top. Actual costs depend on site conditions, finish level, and municipality.

ADU / JADU
$200–$400 /sf
Detached, attached, or garage conversion

Foundation, framing, full MEP, finishes, and Title 24 compliance. Detached new-build ADUs typically land at $300–$400/sf; garage conversions and JADUs start closer to $200/sf. Impact fees are waived for ADUs under 750 sf in most California jurisdictions.

8–14 months design through move-in
Kitchen & Bath Remodel
$250–$500 /sf
Renovation within existing footprint

Mid-range kitchen remodels start around $80K–$120K; high-end kitchens with custom cabinetry and stone run $150K–$250K+. Bathroom renovations range from $40K (standard) to $100K+ (primary suite with wet room). Structural changes, plumbing reroutes, and electrical panel upgrades push costs higher.

4–10 months design through completion
Custom New Construction
$400–$800+ /sf
Ground-up single-family home

Standard construction with good finishes starts around $400–$500/sf. Architecturally detailed homes with premium materials, complex grading, or hillside sites routinely reach $600–$800+/sf. Soft costs (design, engineering, permits, surveys) typically add 12–18% on top of hard construction costs.

18–30 months design through move-in

Ranges reflect Bay Area construction costs as of 2025. Hillside lots, structural retrofits, and historic overlays can push costs significantly higher. We provide project-specific cost guidance during the discovery and feasibility phase.

Permitting

What to expect by region.

Every Bay Area jurisdiction has its own review process, fee structure, and timeline. Here's a snapshot of the regions we work most.

San Francisco

SF's Department of Building Inspection (DBI) runs a multi-step review: plan intake, routing to assigned plan checker, and often a second review cycle. Standard residential permits average 8–12 weeks. Projects in RH-1/RH-2 zones triggering Section 311 neighborhood notification add 30+ days. ADUs benefit from a dedicated review track but typically still take 6–8 weeks. Historic districts (Article 10/11) require separate Planning review.

Oakland

Oakland Building permits residential work through its Planning and Building Department. Over-the-counter permits are available for minor interior work; standard plan check runs 4–8 weeks. Oakland has been proactive on ADU policy and offers fee waivers for ADUs under 750 sf. Projects in the Oakland hills may trigger Wildfire Urban Interface (WUI) requirements including enhanced fire-resistive construction and defensible-space landscaping.

South Bay

San Jose, Palo Alto, Mountain View, and surrounding cities each maintain independent building departments. San Jose's express plan check can clear a residential permit in 3–4 weeks. Palo Alto enforces an individual review process with design review for homes exceeding a floor-area-ratio threshold. Most South Bay cities have adopted the 2022 California Building Code with local amendments — Title 24 energy reports and soils reports are required on virtually every project.

East Bay

Berkeley, Walnut Creek, Concord, and Contra Costa County jurisdictions range from highly efficient to notably slow. Berkeley's design-review process for visible additions can add months; Walnut Creek and Concord typically process standard residential permits in 4–6 weeks. Contra Costa County unincorporated areas have their own building division with generally faster turnaround. Hillside lots across the East Bay often require geotechnical reports and grading permits.

Ready to start your residential project?

Whether you're building an ADU, renovating a kitchen, or designing a home from scratch, we'll help you understand costs, timelines, and what your site allows — before you commit to anything. We respond within 24 hours.